Preparing your site: what has to be ready?
Installation usually takes one day. That only works if the site is ready. If it goes wrong, a low-loader and a crane are left waiting, and that costs by the hour.
Below is exactly what has to be ready and who arranges what.
The ground
The unit has to stand on a level surface with enough bearing capacity. In practice that means a concrete foundation, stacked concrete blocks, concrete slabs or a screw foundation. Grass or loose soil is not enough: the unit then settles unevenly and you see that in doors that stick.
A screw foundation is often the quickest option: steel screw piles are turned into the ground and the frame of the unit sits on those. Nothing has to be dug out or poured, and the piles can be taken out again later. How many piles are needed and how deep they have to go depends on the ground; that also determines the price.
Level matters more than pretty. A couple of centimetres of difference over the length of a 13 metre unit is already too much. If you have doubts about the ground — peat, a recently filled ditch, recently raised terrain — say so beforehand and we will look at heavier foundations.
The route to the spot
A low-loader has to be able to get there and a crane has to be able to set up. Look at the width of the drive, at trees and branches overhanging the route, at lamp posts and at cables above the street.
If there is a house or shed between the street and the spot, the crane has to reach over it. That is almost always possible, but it decides which crane comes and therefore what it costs. Send photos of the situation in advance and we will price it before you sign a quote.
Connection points
Arrange a supply point for water, a supply for electricity and a drainage point, at the spot where the unit will stand. The unit has a 3 × 25A consumer unit and one central 110 mm waste outlet where all the drains come together.
Have your installer check beforehand whether your meter cupboard can take the extra circuit. If the drain is far away, have the fall calculated too — that is the classic nasty surprise afterwards.
On the day itself
Make sure the route is clear: no cars on the drive, no skips in the way, and if necessary a permit to close off the street. You arrange that with your municipality and apply for it in good time.
We position the unit, level it and connect it to the points that are there. After that we walk through it together. Report anything visible straight away and we will put it right.

Checklist
Ground level, even and load-bearing. Route clear for the low-loader and the crane, including overhead. Set-up space available for the crane. Connection points for water, electricity and drainage in place. Meter cupboard checked for room for an extra circuit. Any street closure applied for. Someone present who is allowed to make decisions.
Go through this list with your adviser a week in advance. Then there is still time to arrange something.