Do I need a permit for my unit?
Choose what kind of unit it will be and answer a few questions about the location. We hold your plan up against the national rules from the Dutch Building Decree (Bbl) and tell you where you stand. You can then send the outcome straight along with a request.
Permit check
This check is an indication based on national regulations (the Dutch Building Decree, Bbl) — not legal advice. Your municipality's environment plan may be stricter. We check that for you when you make a request.
A permit for placing a unit
Whether you need an environmental permit to place a housing unit, office unit or care unit depends on three things: what you use the unit for, where it will stand and how large and tall it will be. Since the Dutch Environment Act the national rules sit in the Building Decree (Besluit bouwwerken leefomgeving, Bbl). On top of that, every municipality has an environment plan that can be stricter than the national rules.
When is a unit permit-free?
A unit can be permit-free if it stands in the rear garden area, is no taller than the permitted height and the total area of outbuildings stays below the limit. The rear garden area is the part of your plot behind the front building line of the house, at least one metre from public space. How much you may build there depends on the size of that area: a small rear garden allows less than a generous plot.
Note: permit-free building does not mean you may also live in it. Independent occupation almost always requires a residential designation in the environment plan. A garden office without a toilet and shower is a different matter from a unit where someone sleeps permanently.
The exception for informal care
There is a national exception for informal care (mantelzorg). If there is a demonstrable care need, a unit may stand beside the house without a permit under certain conditions. Dimensions and conditions do apply, and as soon as the care situation ends the residential use has to stop. Municipalities often ask for a statement from a GP, a district nurse or the Dutch care assessment body CIZ.
Temporary placement
Is the unit only there for a few years, during a renovation or for a building project for instance? Then a permit for temporary use can be the answer. It applies for a maximum of fifteen years and is generally easier to obtain than a permanent permit.
What does a permit application cost?
The municipality charges fees for handling your application. These differ per municipality and are usually linked to the construction sum. A regular application takes eight weeks, with a possible extension of six weeks. So start in good time if you have a completion date in mind.
We can take the process off your hands
For every unit we supply the floor plan, the elevations and a site drawing as standard — exactly what the Dutch planning desk asks you for. If you want to hand over the whole permit process, we can arrange that for a fee: from the preliminary discussion with the municipality to submitting and following up the application. What that costs in your case is something you discuss with your sales adviser — it depends on your municipality and the scope of the application.
What to watch out for yourself
- Request your municipality's environment plan for the plot where the unit will go
- Count all your existing outbuildings: shed, garage, garden house and canopy
- Check whether a heritage, nature or conservation area regime applies
- Allow for the distance to the boundary and for your neighbours' view
- Tell your neighbours in good time; that prevents objections afterwards
Questions about the permit check
No. The check is an indication based on the national rules from the Dutch Building Decree (Bbl). Your municipality’s environment plan may be stricter. When you apply, we check that for you.
The part of your plot behind the front building line of your house, at least 1 metre from public space. As a rule, permit-free building is only allowed there.
Yes. There is a national exception for informal care (mantelzorg): under certain conditions a unit may stand beside the house without a permit. There does have to be a demonstrable care need.
Only if the environment plan allows residential use in that spot. Living permanently in the rear garden area almost always requires a permit.
Yes. We can take the entire permit process off your hands, for a fee. What that costs is something you discuss with your sales adviser, because it depends on your municipality and the scope of the application.
The municipality charges fees. These differ per municipality and depend on the construction sum. Your sales adviser will estimate them before you start.
A regular application takes eight weeks, with a possible extension of six weeks. So start in good time.
All about possibilities
Made for Living. Made for Working. Made for All.
Since 2019 we have been building movable space for living, working and staying. In 7 years that has grown to 1872+ units, from a single one in a back garden to complete linked projects.
- ReliabilityAgreements hold, even when things go against us
- Taken care ofFrom first idea to installation, arranged
- FlexibilityStandard where it can be, bespoke where it must be
- ServiceOne dedicated adviser, also after handover
Send in your request
Have you run the check? Then the outcome goes along with your request automatically, so your adviser sees straight away what it is about.
What we do for you
- We check your municipality's environment plan
- You get the floor plan, the elevations and a site drawing
- If you want, we take over the whole permit process
- You discuss what that costs with your sales adviser